Dealing With Ramps and Level Changes on Tile Jobsites

[fa icon="calendar"] Jul 21, 2020 8:30:00 AM / by Scott Carothers

Scott Carothers

Dealing With Ramps and Other Tile Jobsite ChallengesDealing With Ramps and Level Changes on Tile Jobsites

Have you had to deal with ramps and level changes on your tile jobsite? How have you addressed them?

Level Changes Are Challenging

Level changes pose challenges for tile installation especially if the difference in levels is considerable. In that case, you may need a ramp to enable the transition from one level to another. 

The current ANSI specifications offer the following guidance:

A108.01-3.2.3 Changes in Level: 

Specify thresholds to adjust between adjacent finish floor levels when substrate cannot be depressed. 

  • Changes in level up to 1/4" may be vertical and without edge treatment, however, protection of exposed tile edges is advisable. 
  • Changes in level between 1/4" and 1/2" shall be beveled with a slope not greater than 1:2.

3.2.3.1 Changes in level greater than 1/2" shall be accomplished by means of a ramp. The least possible slope shall be used for any ramp.  the maximum slope of a ramp in new construction shall be 1:12 [1" vertical rise to every 12" horizontal].

3.2.3.2 Curb ramps and interior or exterior ramps to be constructed on sites or in existing buildings or facilities where space limitations prohibit the use of a 1:12 slope or less may have slopes and rises as follows:

3.2.3.2.1  A slope between 1:10 and 1:12 is allowed for a maximum rise of 6".

3.2.3.2.2  A slope between 1:8 and 1:10 is allowed for a maximum rise of 3".  A slope steeper than 1:8 is not allowed.

3.2.3.2.3  If existing thresholds at doors are 3/4" in height or less and have (or are modified to have) a beveled edge on each side, they may remain.

Transitioning Without Tile Lippage

Ideally, you can plan ahead for a ramp so the transition happens unobtrusively and without requiring excessive cuts to prevent lippage.  That's where the architect or design professional play an important role.

Take the situation in the image below.

Level Changes Are Challenging

In this situation which should have been addressed and eliminated by the architect or design professional, the installer faced a unique tile jobsite challenge in a new hotel.  

Dealing With a Nine-Inch Level Change

The floor surface in the hallway coming from the hotel rooms was nine inches higher than the adjacent lobby which necessitated a ramp that met the ADA guidelines. 

Unfortunately, the beginning of the downward-sloping ramp (shown with the red oval) did not begin at the end of the hallway wall, but rather it was 22" short which required the installer to incorporate six creative cuts in order to make the transition without any tile lippage.

You'll find no specific language in the ANSI Specification that addresses this situation.  It does however provide guidance for ramps in A108.01 section 3.2.3.1 as mentioned above which states,

"Changes in level greater than 1/2 in. shall be accomplished by means of a ramp.  The least possible slope shall be used for any ramp.  The maximum slope of a ramp in new construction shall be 1:12." 

Solution: A Nine-Foot Ramp

This means that for every twelve inches of horizontal dimension, the vertical may only rise one inch. 

On this job, the ramp extended nine feet and rose nine inches which meets this requirement.

That said, this well-done transition required the installer to incorporate six wedge-shaped cuts of various sizes within the 12" x 24" space.  Each cut changes the direction of the slope while still addressing the next tile with no lippage. 

This installation needed great tile skills and patience along with a dose of geometry to make all the parts of this puzzle fit together properly.

Plus Tile Talent & Patience

This situation should not have occurred. However it did and is proof that good work exists and talented tile people are doing it every day. 

Kudos to this installer for making the best of a bad design which could have easily been handled during the wall framing.

Ramp-Like Cuts to the Drain

If you've encountered shower tile jobsites, you've surely had to deal with creating a slope to the drain. These are similar to ramps in that they require ramp-like cuts to carry water to the drain. The plumbing code requires the floor be sloped one quarter (1/4) of an inch per foot in order to carry the water effectively to the drain. 

>> Read Does Your Tile Slope To the Drain?

Here are three slope to drain photos with the required ramp-like cuts to the drain.

Ramp-Like Cuts to the Drain

Notice that all directions of these shower floors must slope to the drain.

Notice that all directions of these shower floors must slope to the drain.

This last example with radial cuts is very nicely done!

How Have You Dealt With Ramps and Level Changes on Your Tile Jobsites?

>> See Is Your Tile Layout Centered and Balanced, With No Small Cuts?

How Have You Dealt With Ramps and Level Changes on Your Tile Jobsites?

Chances are that you've faced comparable level changes and had make use of your talent and expertise to compensate. Which ones are you most proud of? Let us know in the comments.

If you haven't already, consider becoming a Certified Tile Installer if you aren't already.  As a CTI, you set yourself apart from the crowd and know how to anticipate tile installation problems before they occur. 

As a CTI, you become Qualified Labor. Qualified Labor refers to tile installers who provide and exemplify high-quality work every time, unlike  the mediocre installer often gets the spotlight due to substandard installation practices at a super-cheap price.

Qualified Labor, as illustrated in the Tile Council of North America, (TCNA) Handbook, states,

"Because tile is a permanent finish the lowest bid should not be the driving factor, but rather who is the most qualified to perform the scope of the work specified."

Thanks for reading.

Learn More About Becoming a Certified Tile Installer Click Here to Download the CTI Kit. 

Topics: Ask Scott, Installing Tile TIps

Subscribe to Email Updates

Prevent Problems: Read the Homeowner's Guide  to Hiring a Qualified Tile Installer
Donate Now!

Certified Tile Installer Mike Corona says,

You don't become a tile installer or a business owner overnight. It takes time, enthusiasm, pride, reliability, respectfulness, a willingness to learn, and dedication. No two jobs are the same; each one has its own unique nuances. As a qualified installer, you need to be able to communicate how to deal with those nuances and qualify yourself to not only meet but exceed expectations. Being qualified will exponentially increase your value and you will have endless opportunities.

Mike Corona CTI #923 Corona Marble and Tile

[fa icon="quote-right"]
Mike Corona CTI #923
Click Here to Volunteer

Blogs Written By CTEF Sponsors & Friends

Crossville's Latest News and Views

Daltile's Trend Hub

Joseph Lundgren Consulting In the News Blog

MAPEI's Tech Talk Blog

Neuse Tile Services Blog

TEC Specialty's Expert Advice

Explore Beautiful Tile Installations  Created by  Certified Tile Installers